The Resource Utilization Rate of Bulky Waste Processing System Reaches 100%
- Share
- publisher
- Harden Machinery Ltd.
- Issue Time
- Mar 4,2021
Summary
With the help of the technological means of Internet of things, the bulky waste treatment project has established its own recycling system, combined with the new core technology scheme of bulky waste resource disposal, so that the resource utilization rate of bulky waste can reach 100%, and the bulky waste can be truly turned into treasure.
Since the
implementation of waste classification in Beijing, great attention has been
paid to the treatment of bulky waste, and it is required that each street must
set up at least one temporary storage place for bulky waste. The streets with
conditions can also be equipped with bulky waste treatment stations, or directly
handles the waste on-site. Each district should set up at least one centralized
dismantling and disposal center.
E20 environmental
Platform group visited the first bulky waste resource treatment center in Daxing
district, Beijing. Zhang Zhenguo, general manager of customer, and Wu Binbin,
deputy sales director of Harden sales Department, were in charge of the
reception, and introduced the technical process and operation of the center in
detail.
Zhang and Wu introduced
that the project, located in Huangcun Town, Daxing District, Beijing, covered
an area of about 70,000㎡, with a total construction area of 16,000㎡. The daily capacity is about 160 tons, and
the system can realize 100% resource utilization of bulky waste, which has been
officially in operation.
With the help of
the technological means of Internet of things, the bulky waste
treatment project has established its own recycling system, combined with the
new core technology scheme of bulky waste resource disposal, so that the
resource utilization rate of bulky waste can reach 100%, and the bulky waste
can be truly turned into treasure.
Residents can
download APP to make an appointment for the collection and transportation of
bulk waste. All operations are online, which is convenient and quick. Based on
technologies such as Internet of Things, cloud computing,
big data, AI, GPS positioning and visualization
equipment, the data center provides information management solutions
for the whole life cycle of bulky waste collection, transportation, management
and disposal, realizes real-time, controllable and efficient operations of bulky
waste management and disposal.
The Process of Bulky Waste Processing System Provided by Harden
1)
The
bulky waste is fed into the primary shredder by slat conveyor.
2)
The
entire system is free of dust.
3)
The
discharge of bulky waste is about 300mm after primary shredder.
4)
The
secondary shredder improves shredding efficiency and reduces the discharge size.
5) Wind
shifter achieves weight separation, the finished products can be used to make
plates or incineration power generation.
6) Steel
wire can be sorted by magnetic separator.
7) The
granulator produces a high calorific value RDF that can be used as an
alternative fuel.
Harden is committed to providing customers
with solid waste shredders and overall solid waste solutions. Relying on strong
R&D strength and advanced solid waste shredding technology concept, Harden provides
the global customers with convenient operation and stable performance of single
shaft shredder, double shaft shredder, four shaft shredder, primary shredder
and entire solutions based on hazardous waste, domestic waste, bulky waste,
kitchen waste, waste rubber tires, paper mill waste, industrial solid waste,
medical waste, organic waste, etc.
In the future, Harden will continue to
focus on technological innovation and product upgrading to provide stronger
power for the development of the industry.